Your FWC Water Cooler
Thanks for choosing FWC Solutions. You've scanned the sticker on one of our machines. This page explains how we look after it, what happens when our engineer visits, and how to get help or upgrade.
Need help now?
Report a fault, leak or damage, or book a visit:
๐ Freephone 0800 084 2876
โ๏ธ customercare@filtered-watercoolers.co.uk
Please quote the Site ID and Unit number printed on your sticker, so we know exactly which machine it is.
If water is leaking or a machine looks unsafe: switch it off at the plug, turn off the water supply valve if you can, and call us.
Your service schedule
| Machine | How often we service it | What's included |
|---|---|---|
| Mains-fed water coolers and fountains | Every 6 months | Filter change, full sanitisation, safety and leak checks |
| Bottled water coolers | Every 3 months | Sanitisation, health check, reservoir flush and deep clean |
| Boiling and chilled taps, and water boilers | As set out in your contract | Service, safety checks, and a filter change when it's due |
| Coffee machines | As set out in your contract | Clean, flush, water filter check, drink quality and safety checks |
We contact you before every visit to book a time. If you'd like to know your next service date, call or email us with your Site ID.
What happens when we visit
- We book in with you first, and our engineer signs in at reception.
- The machine is out of use for a short time. You'll see our smiley "Back in a few minutes!" sign while we work, so please don't use the machine until it's gone.
- Filter change on mains-fed machines, when it's due. The new filter is dated.
- Full sanitisation of the water system, taps and dispense area, using approved sanitiser. Then a flush, so your water tastes fresh.
- Drip tray cleaned or swapped. The outside of the machine is wiped down.
- Checks: water temperature, leaks, pipework, shut-off valves and electrical safety.
- Record: we note the serial number and location, and ask you to sign the service record. Anything we find gets reported back to you.
A typical visit takes 20โ30 minutes per water cooler, and longer for coffee machines.
Want more? Upgrade or add to your setup
Need faster flow, colder water, more capacity, hot water, sparkling water, coffee or snacks? We can usually swap or add equipment at your next service visit.
|
๐ง Water coolers: bigger, faster, colder All water coolers High-volume, quick-recovery systems Floor-standing coolers Bottled water coolers |
โจ๏ธ Boiling and chilled water Boiling, chilled and sparkling taps Instant hot water boilers Water fountains and bottle fillers |
|
โ Coffee Coffee machines (bean-to-cup, instant, traditional) Benny Beans coffee beans Flavia drinks |
๐ฅค Vending Free managed vending for your workplace Request a call-back Workplace drinks changes for 2027 |
Supplies
Replacement filters ยท Cups and cones ยท Cleaning and sanitisation
FWC Solutions Ltd, Unit 10 Felspar Road, Mercian Park, Tamworth, Staffordshire B77 4DP ยท Freephone 0800 084 2876